Llanbradach
The colliery site was built on four hillside terraces aligned southwest to northeast, the lowest having standard-gauge sidings with narrow-gauge tipplers and coal screens over. The lower middle terrace had the three shafts with the fan house and stores to the southwest and colliery workshops to the northeast. The upper middle terrace had engine-houses, halls and boiler houses (now gone). An upper terrace had most of the south winding-house which had an arched recess on its south east gable to carry winding-cables across to the shaft that stood on the valley bottom. The brick-built reservoir (NPRN 85054) for boiler-feed and condensing water was also on the upper terrace.
A ‘colliery road’ ran at a yet higher level along the northeast edge of the site and above this was a larger concrete reservoir (NPRN 85051), a quarry to obtain the Pennant Sandstone used in the construction of the buildings and revetment walls and a secondary cable-way to the later tip up the mountain.
